SEGO Resources

Reserve & Resources

Copper Mountain Mine Mineral Reserve Summary (as at January 1, 2021)

The Copper Mountain Mineral Reserve is included in the Copper Mountain Mineral Resource and the effective date of the Mineral Reserve and Mineral Resource is January 1, 2021. A summary of the Mineral Reserve and Mineral Resource is provided below.

NOTE: reserve is in koz (gold and silver) and Moz for resource

Copper Mountain Mine Mineral Reserve

 

Tonnes
(‘000s)

Copper
(%)

Gold
(g/t)

Silver 
(g/t)

Copper
(Mlb)

Gold
(koz)

Silver
(koz)

Proven

 

 

 

 

 

 

 

CMM Pit

49,233

0.31

0.08

1.54

335

122

2,438

CM North Pit

24,785 

0.19

0.07

0.25

106

52

200

New Ingerbelle Pit

59,375

0.26

0.16

0.52

335

307

989

Sub-total (Pit)

133,393

0.26

0.11

0.85

776

481

3,626

Stockpile

52,163

0.15

0.04

0.45

177

67

755

Total Proven

185,556

0.23

0.09

0.73

953

548

4,381

Probable

 

 

 

 

 

 

 

CMM Pit

94,013

0.25

0.08

1.25

518

227

3,769

CM North Pit

44,665 

0.20

0.07

0.34

194

98

484

New Ingerbelle Pit

131,362

0.23

0.14

0.46

666

608

1,974

Sub-total (Pit)

270,040

0.23

0.11

0.71

1,378

933

6,200

Stockpile

Total Probable

270,040

0.23

0.11

0.71

1,378

933

6,200

Proven & Probable

 

 

 

 

 

 

 

CMM Pit

143,246

0.27

0.08

1.35

853

349

6,207

CM North Pit

69,450 

0.20

0.07

0.31

300

149

684

New Ingerbelle Pit

190,737

0.24

0.15

0.48

1,001

916

2,936

Sub-total (Pit)

403,433

0.24

0.11

0.76

2,154

1,413

9,827

Stockpile

52,163

0.15

0.04

0.45

177

67

755

Proven & Probable

455,596

0.23

0.10

0.72

2,331

1,480

10,581

  1. Joint Ore Reserves Committee (JORC) and CIM Definition Standards were followed for Mineral Reserves.
  2. Mineral Reserves were generated using the January 1, 2021 mining surface.
  3. Mineral Reserves are reported at a 0.10% Cu cut-off grade.
  4. Mineral Reserves are reported using long-term copper, gold, and silver prices of $2.75/lb, $1,500/oz, and $18.50/oz, respectively.
  5. An average CMM copper process recovery at block model domain recovery, gold process recovery of 65%, and silver process recovery of 70% is based on geo-metallurgical domains and actual plant values.
  6. An average Ingerbelle copper process recovery of 88.5%, gold process recovery of 71%, and silver process recovery of 65% is based on geo-metallurgical domains, historical recoveries, and recent testwork.
  7. Average bulk density is 2.78 t/m3.
  8. Stockpile grades are approximations based on grade control results.
  9. Stockpile tonnes and grade based on production grade process.

Qualified Person

Mr. Stuart Collins, P.E., serves as the Qualified Person as defined by National Instrument 43-101 and is the Qualified Person for information regarding the Copper Mountain mine’s Mineral Reserve. Mr. Collins is mine technical services director at Copper Mountain and has reviewed and approved the Mineral Reserve estimate for the Copper Mountain Mine.